|
Park Improvement Updates:
Footbridge and ADA Sidewalk
The scope of work for DuPage River Park includes excavation and grading for an accessible sidewalk to connect the existing asphalt path to the pedestrian bridge. Additional improvements to the pedestrian bridge include a boardwalk ramp installation and painting. Construction is anticipated to begin during the fall of 2013 with completion expected by the end of 2013.
|